If the new calendar contains any errors, the Back button can be used to
return to the appropriate page to correct it. If the new calendar is accurate, clicking the
Finish button will create the new calendar and will take you back to the Dimensions
workspace where the newly added members of the Time dimension can be seen.
Though the Application Calendar is now created, it is not saved into the PPS
Planning system until the Time dimension is explicitly saved by clicking on the Save
this Dimension link under the Dimension Tasks on the right side of the Dimensions
workspace, as shown in Figure 7-14. The Check In link will automatically save the
changes and check them in as well. It is recommended that you check in the changes on
a regular basis and after any major changes or modifications to any dimension or model.
The menu bar within the Member Maintenance tab in the Dimensions workspace
shows a drop-down list on the left side. Clicking on the arrow next to the dropdown
list will show the list of all available member sets within the Time dimension.
This is the same for every other dimension as well. In the case of Time dimension
Figure 7-14 The YQM Calendar View within the Time dimension is displayed after
expanding some members.
242 B u s i n e s s I n t e l l i g e n c e w i t h M i c r o s o f t O f f i c e P e r f o r m a n c e P o i n t S e r v e r 2 0 0 7
this drop-down list shows the calendar views that were created including the YQM
calendar view (hierarchy).